3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380

Still deciding? Get samples of $ !
Order Sample
Product Details
Customization: Available
Phase: Single Phase
Type: On-line
Shipping
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Guarantee
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW PayPal
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Self-branded
The supplier has %s Self-brands, check the %arLink for more information
Quality Assurance
The supplier provides quality assurance
QA/QC Inspectors
The supplier has %s QA and QC inspection staff
to see all verified strength labels (22)
  • 3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
  • 3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
  • 3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
  • 3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
  • 3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
  • 3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
Find Similar Products
  • Overview
  • Product Description
  • Specification
  • Packing & Delivery
  • workshop
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
C3K
Protection
Overvoltage
Application
Communication
Classification
Lighting/Power
Standby Time
Long-acting Machine
Standby UPS
Sine Wave Output UPS
Output Capacity
Medium Type
Equipment Mode
Decentralized
Brand
CE
Battery Type
Lead Acid Battery
Input Voltage
110~300VAC
Output Voltage
220VAC 1%
Communication Port
RS232 + Smart Card Slot
Capacity
1-10kVA
Transfer Time
0 Ms
Power Factor
0.8
Electric Energy
504 Wh
Weight
24.5kg
Transport Package
Standard Packaging for Production
Trademark
GANGKOANG
Origin
Wenzhou
HS Code
8504402000
Production Capacity
10000pieces/Weeks

Packaging & Delivery

Package Size
363.00cm * 677.00cm * 440.00cm
Package Gross Weight
15.000kg

Product Description

Product Description
Pure Sine Wave UPS System Tower Rack Online UPS 1KVA 2KVA 3KVA
1.Product Descriptions
Expertly crafted for small and medium enterprises
Ideal for servers, rack and tower mounts, offering versatile setups,
features online double conversion, DSP tech, and pure sine wave,
delivering exceptional performance and a premium look, embodying
the blend of cutting-edge tech with classic products
2.Product Features
Innovative DSP digital control technology
boosts UPS stability and delivers superior quality;
Load power factor at 0.8, in line with electrical trends
and providing enhanced load capacity;
Active input PFC with a factor exceeding 0.98;
Broad voltage and frequency range, suited for remote
areas with challenging grid conditions;
Compatible with generators;
Zero transfer time ensures safe and reliable load operation.
Zero transfer time guarantees safe and reliable load operation.
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380


Specification
Optional configuration suggestions

Commonequipmentpower
Referencetable
Personalcomputer
Server
POS
Cash
register
cemmunikatien
equipment
Switch
Monitoring
equipment
Printer
Scanner
100-300W
350-700W
10-50W
250-300W
20-180W
10-20W
10-15W
10-300W
10-100W










C1K1000VA/800W     Backup  delay  time


ProductModel
Rated
capacity
Loadequipment
power
120W
200W
400W
600W
800W


C1K
800W
Batterysupply
time
53
minutes
30
minutes
11
minutes
5.8
minutes
4.5
minutes












C2K 2000VA/1600W    Backup  delay  time
ProductModel
Rated
capacity
Loadequipment
power
240W
400W
800W
1200W
1600W
C2K
1600W
Batterysupply
time
60
minutes
32
minutes
11
minutes
5.8
minutes
4.5
minutes










C3K 3000VA/2400W     Backup  delay  time
ProductModel
Rated
capacity
Loadequipment
power
360W
600W
1200W
1800W
2400W
C3K
2400W
Batterysupply
time
60
minutes
32
minutes
11
minutes
5.8
minutes
4.5
minutes
UPS Uninterruptible Power Supply
Enterprise-grade online UPS addresses 8 critical power issues, protecting your hardware and data.
Efficiently addresses the following scenarios
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
Computer systems
Network systems
Protect hardware from power surges and prevent data loss; with monitoring
software installed, it automatically saves
files and safely shuts down the computer.
After power loss, the C1K-3KVA can
power the regulator and router, ensuring network devices
function normally.
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
Business/office equipment
Monitoring and automation control systems
Protect office equipment like ATMs,
POS machines, printers, scanners, and fax machines
from surge current damage
High-quality performance tackles
various harsh environments, ensuring
safe operation of monitoring systems, power machinery,
railway signaling, SCADA, and other systems.
Packing & Delivery

Product Package (Supports OEM and Custom Color Box Service)
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
workshop
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
Certifications
3 Phase Online UPS 10kVA 80kVA UPS 380V/220 380V/380
FAQ
Q1: Are you a trading company or a manufacturer?
A1: We are a professional factory with 7 years of expertise in high and low voltage power transformers, substations, vacuum circuit breakers, and power equipment.
Q2: Do you accept customized service?
A2: We offer OEM/ODM services and can print your logo on the product. Our skilled technical and quotation team is ready to deliver a satisfying project based on your drawings and specifications.

Q3: What is your MOQ?
A3: Our MOQ is 1 piece.

Q4: How long is your delivery lead time?
A4: Delivery time depends on product requirements and quantity. Typically, 5~10 working days.

Q5: How do you solve quality problems?
A5: Provide detailed photos of quality issues. Our technical and quality team will analyze and offer a satisfactory solution within 2 days.

Q6: What is the price of shipping?
A6: Shipping prices vary based on the delivery port.

Q7: What are your payment terms?
A7: 30% T/T in advance, 70% before shipment. Western Union and L/C are also accepted.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now